from contact set.
|
|
||
6. Just for reference, and showing the general area of the housing where the coil/ stud terminal will be located. The depth to the casting shelf measurement is 1.00”.
|
distributor cap.This measurement is also 1.00”. |
||
8. The preferred location of the new coil terminal will be here. Note the indexed center punch mark for drilling. The distance shown from the center of the distributor cap screw hole is .625”.
|
9. The distance shown from the top face of the housing is also .625” |
||
10. At this location, drill a .250” hole and de-bur.
|
11. An inside view of the terminal location. |
||
12. This is the hardware layout for the coil stud terminal.
|
|||
13. Coil stud terminal installed with male flag terminal. Note between the shoulder insulating washers at the housing a small amount of 2-part epoxy can be applied for extra rotation resistance on stud. Just snug, do not final tighten.
|
14. Install coil female terminal to male flag. |
||
15. Rotate the male flag terminal to the 3 o’clock position, gently routing the coil wire into a small loop.
|
16. Now finish tightening the stud/terminal assembly. |
||
17. Re-install the distributor cap/ rotor assembly at the proper distributor gear timing location for your magneto.
|
18. Re-connect the capacitor lead to the contact set. This will be the only connection to the contact set. |
||
|
20. Magneto is ready for install.
|